Research Projects

As Principal Investigator

1. Title of Project: Multi-axes active vibration control of a CMM
Agency/Company: Giddings & Lewis – Sheffield Measurement Inc.
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $50,000
Period of Contract: 5/1994 – 4/1995
Candidate’s Share: 100.0% ($50K)

2. Title of Project: Development of advanced systems and technologies for the panel fitting
Agency/Company: Chrysler Corp
Role: PI/PD-Shi
Collaborators: None
Total Dollar Amount: $150,000
Period of Contract: 3/1993 – 4/1995
Candidate’s Share: 100.0% ($150K)

3. Title of Project: On-line intelligent modeling, monitoring and control workstation
Agency/Company: NSF Industry/University Cooperative Research Center (I/UCRC)
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $100,000
Period of Contract: 1/1994 – 12/1995
Candidate’s Share: 100.0% ($100K)

4. Title of Project: Signature analysis for sheet metal stamping
Agency/Company: NSF Industry/University Cooperative Research Center (I/UCRC) and Chrysler Corp
Role: PI/PD-Shi
Collaborators: None
Total Dollar Amount: $100,000
Period of Contract: 1/1994-8/1996
Candidate’s Share: 100.0% ($100K)

5. Title of Project: Multivariate Data Analysis-Technical Assistance Program for Perceptron
Agency/Company: Perceptron Inc.
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $50,000
Period of Contract: 12/1995 – 12/1997
Candidate’s Share: 100.0% ($50K)

6. Title of Project: Process Navigator Validation and Process Variation Reduction
Agency/Company: General Motors Corp
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $300,000
Period of Contract: 5/1995 – 6/1997
Candidate’s Share: 100.0% ($300K)

7. Title of Project: A Testbed for Proactive Maintenance Policy Evaluation in Dimensional Control
Agency/Company: NSF Industry/University Cooperative Research Center
Role: PI/PD-Shi
Collaborators: None
Total Dollar Amount: $25,000
Period of Contract: 9/1/1997 – 8/31/1998
Candidate’s Share: 100.0% ($25K)

8. Title of Project: Intelligent on-line Modeling and Control Modules
Agency/Company: IMT
Role: PI/PD-Shi
Collaborators: None
Total Dollar Amount: $40,000
Period of Contract: 1/1/1997 – 12/31/1998
Candidate’s Share: 100.0% ($40K)

9. Title of Project: Hemming Research
Agency/Company: Forming Technology Institute
Role: PI/PD-Shi
Collaborators: None
Total Dollar Amount: $12,000
Period of Contract: 8/1/1998 – 10/1/1998
Candidate’s Share: 100.0% ($12K)

10. Title of Project: Distributed Sensing and Data Analysis for Auto Body Assembly
Agency/Company: NSF Industry/University Cooperative Research Center
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $50,000
Period of Contract: 9/1/1999 – 8/31/2000 (renewable for one more year)
Candidate’s Share: 100.0% ($50K)

11. Title of Project: Multivariate SPC and Variation Reduction for DN Body Assembly
Agency/Company: IMT and Chrysler
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $110,000
Period of Contract: 1/1/1998 – 12/31/2000
Candidate’s Share: 100.0% ($110K)

12. Title of Project: Agile and Precision Stamping Lab Equipment Fund
Agency/Company: Auto Body Consortium
Role: PI/PD-Shi
Collaborators: None
Total Dollar Amount: $140,000
Period of Contract: 6/1/1996 – 12/31/1999
Candidate’s Share: 100.0% ($140K)

13. Title of Project: Proactive Maintenance: Integration of Engineering, Statistics, and Operations Research towards a General Framework and Methodology
Agency/Company: National Science Foundation
Role: PI/PD- Shi
Collaborators: Pollock (Co-PI) and Nair (Co-PI)
Total Dollar Amount: $285,000
Period of Contract: 9/1997 – 8/2002
Candidate’s Share: 33.3% ($95K)

14. Title of Project: Agile and Precision Sheet Metal Stamping – Near Zero Stamping progra
Agency/Company: Advanced Technology Program, National Institute of Standards and Technology (NIST) and Near Zero Stamping Inc.
Role: PI/PD- Shi
Collaborators: Ni(Co-PI), Hu(Co-PI), Ghosh(Co-PI), Jeff Wu(Co-PI)
Total Dollar Amount: $2,880,000
Period of Contract: 1/1995 – 06/2000
Candidate’s Share: 75.0% ($2,160K)

15. Title of Project: CAREER: The In-Process Quality Improvement Methodologies for Manufacturing
Agency/Company: National Science Foundation (NSF) CAREER Award
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $315,000 (plus additional $200,000: $100,000 from industry and $100,000 from NSF match)
Period of Contract: 9/1996 – 8/2002
Candidate’s Share: 100.0% ($315K)

16. Title of Project: Stream of Variation for Multistage Manufacturing Processes
Agency/Company: NSF ERC on RMS at U of M
Role: PI/PD- Shi
Collaborators: Ni(Co-PI)
Total Dollar Amount: (estimated $240,000 per year, sub account from ERC)
Period of Contract: 9/1998 – 8/2004 (renewable up to NSF ERC managements)
Candidate’s Share: 50.0% ($120K)

17. Title of Project: Incremental Machine Learning in Vehicle Diagnosis
Agency/Company: Ford
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $14,220
Period of Contract: 1/1/2002 – 8/31/2004
Candidate’s Share: 100.0% ($14K)

18. Title of Project: Variation Reduction for Multistage Manufacturing Processes
Agency/Company: DaimlerChrysler and IMT
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $101,407
Period of Contract: 9/1/2000 – 8/31/2002
Candidate’s Share: 100.0% ($101K)

19. Title of Project: An-Image-based high Temperature Deformation Process Control Systems: Samrtsmith Predictive Control Systems
Agency/Company: NIST-ATP and OG Technology Inc.
Role: PI/PD- Shi
Collaborators: Hu(Co-PI)
Total Dollar Amount: $388,450
Period of Contract: 1/1/2001-12/31/2003[SJJ1]
Candidate’s Share: 50.0% ($194K)

20. Title of Project: Throughput improvement and waste reduction in the HTS processes in Pfizer
Agency/Company: Pfizer
Role: PI/PD – Shi
Collaborators: None
Total Dollar Amount: $50,000
Candidate’s Share: 100% ($50K)

21. Title of Project: Variation Management for Aircraft Structures
Agency/Company: TMI and Lockheed Martin
Role: PI/PD- Shi
Collaborators: Hu(Co-PI), Ivy(Co-PI)
Total Dollar Amount: $140,000
Period of Contract: 5/1/2001-5/31/2004
Candidate’s Share: 33.3% ($47K)

22. Title of Project: Consumer Relationship Management and Business Intelligence Researc
Agency/Company: Powerise
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $80,000
Candidate’s Share: 100.0% ($80K)

23. Title of Project: Adaptive Assembly for Automotive Body Manufacturing Systems
Agency/Company: General Motors Satellite Lab at University of Michigan
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $300,000
Period of Contract: 1/1/2003 – 12/31/2005
Candidate’s Share: 100.0% ($300K)

24. Title of Project: DOE Based APC: A Methodology for Process Variation Reduction Beyond Robust Parameter Design
Agency/Company: National Science Foundation
Role: PI/PD- Shi
Collaborators: Wu(Co-PI)
Total Dollar Amount: $295,500
Period of Contract: 9/1/2002-8/31/2006
Candidate’s Share: 50.0% ($148K)

25. Title of Project: Causal Network Modeling and Analysis for Health Care Data
Agency/Company: Synchronous Knowledge Inc.
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: requested $40000
Candidate’s Share: 100.0% ($40K)

26. Title of Project: Active Control of C-flex for Variation Reduction of Automotive Body Assembly
Agency/Company: General Motors Collaborative Research Lab at UM
Role: PI/PD- Shi
Collaborators: Hu(Co-PI)
Total Dollar Amount: $150,000
Period of Contract: 1/1/2006 – 8/31/2007
Candidate’s Share: 50.0% ($75K)

27. Title of Project: Data Mining and Decision Making for Proactive Maintenance of RMS
Agency/Company: NSF ERC on RMS
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $140,000
Period of Contract: 5/1/2003-8/31/2005
Candidate’s Share: 100.0% ($140K)

28. Title of Project: Forging Process Control through Signature Analysis
Agency/Company: Forging Industry Educational and Research Foundation
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $10,000
Period of Contract: open
Candidate’s Share: 100.0% ($10K)

29. Title of Project: Quality-Ensured Maintenance Strategy for Complex Manufacturing Systems
Agency/Company: NSF ERC on RMS
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $200,000
Period of Contract: 9/1/2005 – 8/31/2007
Candidate’s Share: 100.0% ($200K)

30. Title of Project: Development of a CAE Design Tool for Minimizing Door Seal Gap Variation by Optimizing Component and Sub-Assembly Locator Position & Orientation
Agency/Company: Ford Company
Role: PI/PD- Shi
Collaborators: Jin(Co-PI)
Total Dollar Amount: $99,864
Period of Contract: 8/1/2006 – 12/31/2007
Candidate’s Share: 50.0% ($50K)

31. Title of Project: Data Mining and Causal Discovery for Predictive Process Control in Data Rich Environments
Agency/Company: Department of Energy
Role: PI/PD- Shi
Collaborators: None
Total Dollar Amount: $564,000
Period of Contract: 1/1/2004-12/31/2008
Candidate’s Share: 100.0% ($564K)

32. Title of Project: Sensor-based Prognostics and Predictive Process Control for Hot Deformation Processes
Agency/Company: Michigan 21st Century Job Fund
Role: PI/PD- Shi
Collaborators: Jin(Co-PI)
Total Dollar Amount: $1,742,500 ($895, 000 from the MEDC – 21st Century Job fund, $30,000 from UM contribution, $817,500 from industrial cash/in-kind contribution)
Period of Contract: 1/1/2007 – 6/30/2010
Candidate’s Share: 50.0% ($871K)

33. Title of Project: Advanced Tonnage Signal Analysis for Forging Processes
Agency/Company: NSF SBIR and OG Technologies
Role: PI/PD- Shi
Collaborators: Jin(Co-PI)
Total Dollar Amount: $200,000
Period of Contract: 9/1/2006 – 8/31/2009
Candidate’s Share: 50.0% ($100K)

34. Title of Project: In-situ Process Control and Variability Reduction for Nano-powder Production Scale-up
Agency/Company: Department of Energy/nGimat Company
Role: PI/PD- SHI
Collaborators: None
Total Dollar Amount: $197,712
Period of Contract: 9/01/2010 – 8/31/2012
Candidate’s Share: 100.0% ($198K)

35. Title of Project: Imaging-based Optical Caliper for Objects in Hot Manufacturing Processes
Agency/Company: Department of Energy/OG Technologies
Role: PI/PD- SHI
Collaborators: None
Total Dollar Amount: $315,000
Period of Contract: 9/01/2010 – 8/31/2012
Candidate’s Share: 100.0% ($315K)

36. Title of Project: SICS: A Sensor-based in-line control system for the surfaces of continuously cast slabs
Agency/Company: Department of Energy/OG Technologies
Role: PI/PD- SHI
Collaborators: None
Total Dollar Amount: $215,000
Period of Contract: 9/01/2010 – 8/31/2013
Candidate’s Share: 100.0% ($215K)

37. Title of Project: Causation-based monitoring, diagnosis and control for complex systems
Agency/Company: NSF-ID: 927574
Role: PI/PD- SHI
Collaborators: None
Total Dollar Amount: $389,500
Period of Contract: 9/01/2009 – 8/31/2014
Candidate’s Share: 100.0% ($390K)

38. Title of Project: Collaborative Research: Process Monitoring and Control in Autocorrelated Multistage Manufacturing Processes
Agency/Company: NSF – Award ID: 1233143
Role: PI/PD- SHI
Collaborators: None
Total Dollar Amount: $200, 000
Period of Contract: 9/01/2012 – 8/31/2016
Candidate’s Share: 100.0% ($200K)

39. Title of Project: Variation Analysis for Composite Manufacturing
Agency/Company: Boeing Company
Role: PI- Shi
Collaborators: Kamran Paynabar(Co-PI)
Total Dollar Amount: $270,000
Period of Contract: 1/1/2013 to 12/31/2015
Candidate’s Share: 50.0% ($135K)

40. Title of Project: Data Fusion for Metamodeling and Hybrid Process Control in High Speed Rail Manufacturing
Agency/Company: Department of Energy/OG Technologies
Role: PI/PD- SHI
Collaborators: None
Total Dollar Amount: $280, 476.55
Period of Contract: 9/01/2014 – 8/31/2017
Candidate’s Share: 100.0% ($280K)

41. Title of Project: Method for data fusion and domain knowledge incorporation for multiple sensor based anomaly detection
Agency/Company: Samsung Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $149,950.00
Period of Contract: 12/1/2015 to 1/31/2017
Candidate’s Share: 100.0% ($150K)

42. Title of Project: Stream of Variation Modeling and Analysis for Composite Manufacturing
Agency/Company: Boeing Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $300,000
Period of Contract: 7/1/2016 to 6/30/2019
Candidate’s Share: 100.0% ($300K)

43. Title of Project: Data Fusion for Quality Assured Proactive Maintenance for Defect Reduction and Yield Improvement.
Agency/Company: Samsung Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $99,998.65
Period of Contract: 2/1/2017 – 1/31/2018
Candidate’s Share: 100.0% (~$100K)

44. Title of Project: Multistage Process Control for Correlation Analysis between Semiconductor Processes
Agency/Company: Samsung Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $200,000
Period of Contract: 3/1/2017 – 12/31/2018
Candidate’s Share: 100.0% ($200K)

45. Title of Project: Run-to-Run Control System Optimization Based on Artificial Intelligence and Machine Learning
Agency/Company: Samsung Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $150,000
Period of Contract: 10/1/2017 – 1/31/2019
Candidate’s Share: 100.0% ($150K)

46. Title of Project: Dimension Variation Reduction in Half to Half Composite Fuselage Assembly and Transportation
Agency/Company: Boeing Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $351,232
Period of Contract: 1/1/2019 to 12/31/2021
Candidate’s Share: 100.0% ($351K)

47. Title of Project: Data Analytics and Data Compiler for Multistage Manufacturing System
Agency/Company: OG Technologies Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $58,675
Period of Contract: 1/1/2020 to 12/31/2020
Candidate’s Share: 100.0% ($58K)

48. Title of Project: Development of methodologies of data fusion for quality improvements
Agency/Company: OG Technologies Company
Role: PI- Shi
Collaborators: None
Total Dollar Amount: $200,000
Period of Contract: 1/1/2020 to open (Donation funds)
Candidate’s Share: 100.0% ($200k)

49. Title of Project: “SaTC: CORE: Medium: Collaborative: Cyber-threat Detection and
Diagnosis in Multistage Manufacturing Systems through Cyber and
Physical Stream Data Analytics”
Agency/Company: NSF
Amount: $300,000.00
Role: PI-Shi
Collaborators: None
Period of Contract 6/1/2020 – 5/31/2024.
Candidate’s Share: 100.0% ($300k)

50. Title of Project: “SAGE: Stealthy Attack Generation for Cyber-Physical Systems – A New MathWorks-Based Curriculum
Agency/Company: MathWorks, Inc.
Amount: $20,000.00
Role: PI-Shi
Collaborators: None
Period of Contract 7/1/2021 – 6/30/2022
Candidate’s Share: 100.0% ($20k)

51. Title of Project: “Scalable Standard Testing and Analysis Protocol with Advanced Data Analytics/Machine Learning”
Agency/Company: NSF IUCRC
Amount: $180,000.00 (10% IDC)
Role: PI-Shi
Collaborators: Dr. Chuck Zhang, Dr. Kyriaki Kalaitzidou
Period of Contract 4/1/2022 – 3/31/2025
Candidate’s Share: 50.0% ($90k)

 

As Co-Principal Investigator

1. Title of Project: 2mm program – Variation Reduction for T300
Agency/Company: Chrysler Corp
Total Dollar Amount: $340,000
Role: co-PI
Collaborators: PI/PD-J. Ni, Co-PIs- Shi and Hu
Period of Contract: 1/1993 – 12/1994
Candidate’s Share: ~33.3% ($113K)

2. Title of Project: Process Capability Study for Chrysler NS Program
Agency/Company: Chrysler Corp
Total Dollar Amount: $300,000
Role: co-PI
Collaborators: PI/PD- J. Ni, Co-PIs- J. Shi, D. Ceglarek, G. Herrin and X. Wu
Period of Contract: 9/1996 – 8/1997
Candidate’s Share: 20% ($60K)

3. Title of Project: Remote Diagnosis and System Reliability Evaluation
Agency/Company: NSF Engineering Research Center at the University of Michigan
Total Dollar Amount: ERC supports two 50 % GSRA
Role: co-PI
Collaborators: PI/PD- Ni, Co-PIs- Shi
Period of Contract: 9/1996-8/1998
Candidate’s Share: 50% ($60k)

4. Title of Project: Integrated Dimensional Design Evaluation and Process Control for Automotive Door Manufacturing
Agency/Company: General Motors Corp
Total Dollar Amount: $140,000
Role: co-PI
Collaborators: PI/PD- Ceglarek, Co-PIs- Shi
Period of Contract: 10/1995 – 12/1998
Candidate’s Share: 50% ($70K)

5. Title of Project: D-Ring Seal Gap Dimensional Variation Reduction and System Analysis
Agency/Company: General Motors
Total Dollar Amount: $125,000
Role: co-PI
Collaborators: PI/PD- D. Ceglarek, Co-PIs- Shi and Hu
Period of Contract: 11/1/1998 – 10/31/2000
Candidate’s Share: ~33.3% ($42K)

6. Title of Project: Dimensional Control for WJ program using Multiple in-line Sensing Stations
Agency/Company: Chrysler Corp
Total Dollar Amount: $150,000
Role: co-PI
Collaborators: PI/PD- D. Ceglarek, Co-PIs- Shi
Period of Contract: 3/1/1998 – 2/28/2000
Candidate’s Share: 50% ($75K)

7. Title of Project: Panel Fitting Process Evaluation and Optimization
Agency/Company: NSF Industry/University Cooperative Research Center
Total Dollar Amount: $50,000
Role: co-PI
Collaborators: PI/PD- D. Ceglarek, Co-PIs- Shi
Period of Contract: 1/1/1999 – 12/31/1999
Candidate’s Share: 50% ($25K)

8. Title of Project: Variation and Reliability Modeling and Analysis for Assembly Fixtures
Agency/Company: General Motors
Total Dollar Amount: $100,000
Role: co-PI
Collaborators: PI/PD- D. Ceglarek, Co-PIs- Shi
Period of Contract: 1/1/1998 – 12/31/2001
Candidate’s Share: 50% ($50K)

9. Title of Project: Real-Time Active Balancing for High Speed Machining
Agency/Company: Advanced Technology Program, National Institute of Standards and Technology (NIST) and Balance Dynamics Corp
Total Dollar Amount: $800,000
Role: co-PI
Collaborators: PI/PD- Ni, Co-PIs- Shi
Period of Contract: 1/1998 – 12/2000
Candidate’s Share: 50% ($400K)

10. Title of Project: Quality Control for a Multistage Process Combining SPC and APC
Agency/Company: Hong Kong NSF (RGC)
Total Dollar Amount: HKD 437,817.00
Role: co-PI
Collaborators: PI/PD- Tsung, Co-PI- Shi and Tsui
Period of Contract: 1/2000 – 12/2001
Candidate’s Share: 33% (HKD 145K)

11. Title of Project: Concurrent Design of Next-Generation Power trains
Agency/Company: U.S. DOD-Army/TACOM
Total Dollar Amount: $3,000,000
Role: co-PI
Collaborators: PI/PD- P. Papalambros, Co-PIs- J. Hu, J. Shi, D. Assanis, Z. Filipi, K. Nagarathnam, N. Michelena and K. Saitou
Period of Contract: 5/1/2001 – 4/30/2003
Candidate’s Share: 12.5% ($375K)

12. Title of Project: Maintenance models involving minor and major maintenance
Agency/Company: RESEARCH GRANTS COUNCIL
Total Dollar Amount: (requested) HKD 576,000
Role: co-PI
Collaborators: PI/PD- P. Chan, Co-PIs- Tsung and Shi
Period of Contract: 10/1/2003-9/30/2006
Candidate’s Share: ~33.3% (HKD 192K)

13. Title of Project: A Unified Methodology for Service Quality Improvement through Integration of QFD and SEM
Agency/Company: RESEARCH GRANTS COUNCIL
Total Dollar Amount: (requested) HKD 630,000
Role: co-PI
Collaborators: PI/PD- Tsung, Co-PI- Shi
Period of Contract: 10/1/2003-9/30/2006
Candidate’s Share: 50% (HKD 315K)

14. Title of Project: Future Combat Systems (FCS): Phase II Production Planning Study for the Manned Ground Vehicle (MGV)
Agency/Company: Boeing Company and Department of Defense
Total Dollar Amount: $599,000
Role: co-PI
Collaborators: PI/PD- Hu, Co-PI- John Cristiano, Steve Skerlos, Albert Shih and Galip Ulsoy
Period of Contract: 1/2005 – 3/2006
Candidate’s Share: 20% ($120K)

15. Title of Project: A New Venture to Expand Response Surface Methodology for Engineering Process Control
Agency/Company: RESEARCH GRANTS COUNCIL
Total Dollar Amount: (requested) HKD 558,000
Role: co-PI
Collaborators: PI/PD- Tsung, Co-PI- Shi and Jin
Period of Contract: 10/1/2005-9/30/2008
Candidate’s Share: ~33.3% (HKD 186K)

16. Title of Project: ARI-MA: Development of Integrated Real-Time Imaging and Isotope Detection Algorithms for 3-D Position-Sensitive Semiconductor Gamma-Ray Imaging Spectrometers and Sensor Networks
Agency/Company: National Science Foundation, CEBT-0736091
Total Dollar Amount: $1,993,290
Role: co-PI
Collaborators: PI/PD- Zhong He, Co-PI- J. Shi and J. Fessler
Period of Contract: 7/30/2007 – 12/31/2011
Candidate’s Share: ~33.3% ($664K)

17. Title of Project: Bayesian process control for nano-manufacturing with mixed-resolution information
Agency/Company: Hong Kong RGC
Total Dollar Amount: HKD 279,610
Role: co-PI
Collaborators: PI/PD- Tsung, Co-PI- Huang and Shi
Period of Contract: 01/01/2009 – 12/31/2011
Candidate’s Share: 33.30% (HKD 93K)

18. Title of Project: Metamodel-Based Measurement, and Optimization of Engineered Surfaces
Agency/Company: NSF
Total Dollar Amount: $380,000
Role: co-PI
Collaborators: PI/PD- Vengazhiyil Co-PI- Shi
Period of Contract: 9/01/2010 – 8/31/2015
Candidate’s Share: 50% ($190K)

19. Title of Project: Reliability Modeling, and Improvement of FUSE Video System (April 2014 ~ April 2015)
Agency/Company: Endochoice Company
Total Dollar Amount: (Gift fund no IDC) $80,000
Role: co-PI
Collaborators: PI- Paynabar, K. , Co-PI- Shi, J.
Period of Contract: 5/1/2014 – 4/30/2015
Candidate’s Share: 50% ($40K)

20. Title of Project: SNM: Roll-to-Roll Manufacturing of High Quality Bucky-tape with Aligned and Crosslinked Carbon Nanotubes Through In-line Sensing and Control
Agency/Company: NSF Award Number: 1344672
Total Dollar Amount: $1,465,059.00
Role: co-PI
Collaborators: PI- Liang, Co-PI- Zhang, Shi, Vanli and Wang
Period of Contract: 10/1/2013 to 9/30/2017
Candidate’s Share: 20% ($320K)

21. Title of Project: Collaborative Research: Online Monitoring of High-Dimensional Streaming Data Using Adaptive Order Shrinkage
Agency/Company: NSF
Total Dollar Amount: $22,400.00
Role: co-PI
Collaborators: PI- Mei Co-PI- Shi
Period of Contract: 9/1/2014 – 8/31/2017
Candidate’s Share: 50% ($11K)

22. Title of Project: DATA-DRIVEN RECONFIGURABLE MANUFACTURING SYSTEMS FOR THE AIR FORCE AIRCRAFT MAINTENANCE ENVIRONMENT (SBIR PHASE I)
Agency/Company: Department of Defense/ Aging Aircraft Consulting LLC (AACL)
Total Dollar Amount: $50,000
Role: co-PI
Collaborators: PI/PD- Paynabar, K. , Co-PI- Shi, J.
Period of Contract: 9/01/2016 – 8/31/2017
Candidate’s Share: 50% ($25K)